Steel fabrication Process involves Grinding, Tacking, Welding, Cutting, Bending, Drilling, Punching, Burning or Melting, and other critical crafting methods using various high-quality tools and CNC equipment under the supervision of highly expert engineer or experienced workmen. The entire steel fabrication process is moduled very systematically and requires scheduling, planning, precision, knowledge and experience. Bharat Engineering and construction have highly experienced engineers and fabrication who are well aware of all the crucial steps and measures that need to be taken care of in the fabrication process.

plant construction includes fabrication of various equipment’s and interconnecting pipes their supports and structures which takes shapes as per the design.
- Equipment fabrication includes rolling of plates, pressing of dishends, limpets, coil and there fabriaction with Grinding, Tacking, Cutting, Bending, welding process and finally assembling with agitators, mixers, dryers. supporting them with lugs, legs, skirts saddles and other arrangement. it takes 4 weeks to 40 weeks to plan, design, procure, fabrication, quality, inspection, testing transporting to site or on sites. Its a integration of various dedicated peoples to successfully commence. There are more than thousands of equipment used in single plant.
- Piping fabrication is the highest consuming cost and time. standard pipes are available upto 24″. engineering department will proide the isometric of interconnecting lines.Since Bharat engineering and construction is EPCM organization we had a dedicated team for Piping engineering. Our engineering and construction team well synchronize the process of fabrication, erection, commisssioning, quality, inspection, intallation, testing.
- Structural fabrication steel is usually fabricated to create structures like beams, trusses, hollow sections, angles and plates.
These steel members must be accurately fabricated before assembling them together. All component parts of these members are fitted-up temporarily with rivets, bolts, or small amounts of welds. Various fastening methods are employed to deliver different types of finishes. Finishing is generally performed by milling, sawing or other suitable methods.
Construction Needs:
Design helps to know the type of structure you want to construct. Commercial structures have a distinct designing process. Similarly, residential structures are totally dissimilar from industrial structures. Hence, all the structures demand different types of construction processes. Moreover, any and every type of construction process requires unique structures varying in sizes, dimensions, and designs. Each structure has to be specifically designed and fabricated before constructing and assembling them together. For any joint to be site welded, the members will have to be held securely in position such that the setup for welding is accurate and rigid.

Erection Techniques:
Mobile Elevating Work Platforms and cranes are predominantly used in the erection of steel structures for buildings and bridges. However, there various other techniques that are sometimes used for constructing steel bridges. Cranes are usually divided into two broad categories, mobile and non-mobile cranes. Truck mounted, crawler and all-terrain cranes are included in the first category, while tower cranes are included in the second category.
The MEWPs can be used both on the ground or on the partly erected steel structure, in order to erect lighter steel elements. These MEWPs are used to access the steelwork during erection to bolt up the pieces lifted by the crane. Important measures need to be taken before using the MEWPs such as first checking if the steel structure can support the weight of the MEWP and then determining whether they should be used on the ground or on the erected structures.
Steel Erection:
There are four primary tasks that need to be considered before the steel erection process.
– It is extremely important to establish the foundations and confirm if they are suitable and safe for erection to commence.
– With the help of cranes or sometimes by jacking, lifting and placing components into position is essential. Additionally, to secure the components in place, bolted connections are made but they may not be fully tightened. Similarly, bracings may not be fully secured.
– Aligning the structure is essential, principally by checking that column bases are lined and leveled and columns are plumb. To allow column plumb to be adjusted, packing in beam-to-column connections may need to be changed.
– Last but the least, bolting-up is required, which means completing all the bolted connections to secure and impart rigidity.

Steel fabrication and erecting steel structures are a lengthy process and they require immense skills, knowledge, and practice. Our steel fabricators at Northern Weldarc use the best steel fabrication tools and equipment to ensure that the fabrication and erection processes of steel structures are done with accuracy and perfection.
to be continue